Steady new construction on the west side, which brings the slab-age question to the front. Concrete needs roughly 28 days before it can take a coating, and in fast-moving build-outs that window gets squeezed. Somersett is also built into the hillside on engineered cut-and-fill pads, so we look harder than usual at existing cracks before quoting.
What we install here
The same systems as everywhere else we work: full-broadcast flake, metallic, quartz and solid colour, over a diamond-ground slab with a polyaspartic topcoat. What changes between neighbourhoods is slab condition and therefore prep, which is where the cost variation lives. See the cost guide for real ranges.
The Reno constants
Wherever you are in this area, the same three things determine whether a floor lasts: hot tire resistance, a UV-stable topcoat, and a slab that was tested for moisture before anyone coated it. Full detail on why coatings fail in Reno.
Booking
Call 775-362-7367 for a free on-site measure in Somersett. Most standard two-car garages are completed within a single working day.
Slab age is the first question
Somersett is still building out, and that creates one issue that does not apply in established neighbourhoods: concrete that has not finished curing.
A slab needs roughly 28 days before it can accept a coating. It is still releasing substantial mix water, and the surface has not developed full strength. Coating inside that window produces adhesion failure that typically appears six to eighteen months later — long after anyone connects it to the timing. In fast-moving build-outs that window gets compressed, sometimes by builder-arranged contractors working to a completion date rather than to the concrete's schedule.
We confirm the pour date on every Somersett job before quoting, and if nobody can tell us, we test rather than guess.
Clay and crack assessment
Somersett is built into the hillside on engineered cut-and-fill pads, and that construction method makes crack assessment matter more than usual. Where a slab spans the transition between undisturbed cut and compacted fill, differential settlement is a real possibility. We look harder at cracks here than almost anywhere else we work — specifically for vertical displacement or progressive widening, which indicate active movement rather than dormant shrinkage.
A dormant crack routes, fills and disappears. An active one will reopen through any coating you put over it, and the honest answer in that case is to address the movement first.
Getting a quote in Somersett
Call 775-362-7367 or use the form on this page. We will come out, measure, assess the slab properly, set a moisture indicator test and leave physical colour samples with you overnight. The quote comes back written and specified line by line — preparation method, flake weight, topcoat product — so you can compare it against anything else you are holding.
No charge, no obligation, and if we think your slab is not ready we will tell you that instead of selling you a floor.
Coordinating with your builder
If your home is new or still finishing, a few questions are worth putting to the builder. Ask for the garage slab pour date in writing, because it determines when we can start. Ask whether a vapour retarder went in beneath the slab, since that affects moisture testing. And if a garage coating was included in your build package, find out what system it actually is — builder-grade coatings are frequently thin partial-broadcast systems with an epoxy topcoat.
That does not mean refuse it. It means know what you are getting, and whether it is worth upgrading before the garage fills up with boxes.
Common questions
How quickly can you get to Somersett?
Typically one to three weeks out for residential work. We're based in Reno so travel is minimal anywhere in the metro.
If you're on a deadline — selling, or a contractor waiting on the floor — say so when you call and we'll tell you honestly whether we can meet it.
Do you have references nearby?
Yes. We can point you to completed work in and around Somersett, and some customers are happy to talk to prospective ones.
We'd rather you asked than took our word for it.
Ready for a floor that survives a Sierra winter?
Free on-site measure, honest assessment of your slab, and a written quote you can hold us to.